Turn back clock of Camp Hale

PANDO, CO - MARCH 26: Parts of the field house still stand at Camp Hale, March 26, 2015. Federal land managers embark on a proposed $30 million project to turn back clock and restore a high mountain river valley, that was filled in with millions of tons of gravel and transformed during World War II training facility, back to its original path at Camp Hale. (Photo by RJ Sangosti/The Denver Post via Getty Images)
PANDO, CO - MARCH 26: Parts of the field house still stand at Camp Hale, March 26, 2015. Federal land managers embark on a proposed $30 million project to turn back clock and restore a high mountain river valley, that was filled in with millions of tons of gravel and transformed during World War II training facility, back to its original path at Camp Hale. (Photo by RJ Sangosti/The Denver Post via Getty Images)
Turn back clock of Camp Hale
LICENTIE KOPEN
Hoe mag ik dit beeld gebruiken?
€ 475,00
EUR

GEGEVENS

Beperkingen:
Neem voor gebruik voor alle commerciële of promotiedoeleinden contact op met uw lokale kantoor.
Credits:
RJ Sangosti / Contributor
Redactioneel nr.:
467771822
Collectie:
Denver Post
Gemaakt op:
26 maart 2015
Datum van uploaden:
Soort licentie:
Release-informatie:
Geen release. Meer informatie
Bron:
Denver Post
Naam materiaal:
CDXXEAGLEVALLEYDSC_1826
Max. bestandsgrootte:
4808 x 3280 px (40,71 x 27,77 cm) - 300 dpi - 7 MB